Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

      contact us

      聯系我們

      TEL:0531-84233822

      TEL:15550068833/13954115865

      E-mail:jinliyeya@126.com

      Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

      Company News

      Usage and installation steps of hydraulic lifting platform

      Source: Time:2020-03-14 09:02:33 views:

      Usage and installation steps of hydraulic lifting platform

      The usage method and installation steps of the 1137 hydraulic lifting platform. There are many details to pay attention to when using the hydraulic lifting platform. The following mainly discusses the installation steps of the hydraulic lifting platform:

      1、 Compilation basis: Based on the user manual of the guide rail elevator, construction organization design, and on-site geological conditions.

      2、 Preparation work before construction: (1) Inspect the work site for pits, ditches, hidden ditches, and holes, and check for high-voltage and communication lines above. If the above phenomena occur, take support measures. (2) Check for any obstacles on the entrance and exit roads. (3) The tools, toolboxes, rigging, rope buckles, safety helmets, safety belts, and other items used by various trades participating in the installation and dismantling of elevators (c ā n ji ā) shall be transported to the work site for backup.

      3、 Foundation: The aluminum (Al) alloy elevator foundation has been processed by the civil construction unit (ch ǔ l ǐ).

      4、 Basic requirements for safe operation: (1) Personnel involved in installation and dismantling must be familiar with the mechanical performance and structural characteristics of the elevator, and possess proficient operation and control techniques as well as the ability to troubleshoot general faults. (2) The workers involved in this work should have clear division of labor, each responsible for their own duties, with one person designated to direct the work and establish communication signals. (3) Adhere to all disciplines established to ensure safe production, carry complete safety equipment, and ensure that personnel working at heights meet the relevant regulations of the labor department. It is strictly prohibited to work under the influence of alcohol. (4) In the event of snow, rain, heavy fog, or weather with wind speeds exceeding 13 meters per second, this operation shall not be carried out. (5) The transformer power grid at the construction site shall have a transformer capacity of not less than 100KVA.

      5、 Inspection after installation: (1) Recheck whether each fastening point meets the requirements, and tighten if there is any looseness. (2) Check if all components are complete and in effective condition.

      6、 Installation completed:

      (1) The trial operation of the crane includes trial operation, static load test, and dynamic load operation. Before the previous step is qualified, the next step of trial operation cannot be carried out. ?

      (2) Clean the tools, rigging, equipment (sh è b è i), and debris on the construction site.

      (3) Personnel and equipment exit the site.

      {10}

      Links

      久久中文娱乐网| 国产50部艳色禁片无码| 中文字幕专区高清在线观看| 中文字幕人妻在线视频不卡乱码| HEYZO无码综合国产精品227| 国模吧无码一区二区三区| 中文字幕视频免费| 乱人伦人妻中文字幕无码| 国产精品99久久久精品无码| 中文国产成人精品久久亚洲精品AⅤ无码精品 | 日韩亚洲国产中文字幕欧美| 精品日韩亚洲AV无码一区二区三区 | 久久无码AV一区二区三区| 亚洲AV永久无码精品一区二区国产| 无码精品国产dvd在线观看9久| 无码人妻一区二区三区免费视频 | 刺激无码在线观看精品视频| 精品亚洲成在人线AV无码| 色综合久久中文综合网| 亚洲AV无码之日韩精品| 99久久国产热无码精品免费| 无码国产午夜福利片在线观看| 超碰97国产欧美中文| 中文字幕热久久久久久久| 亚洲美日韩Av中文字幕无码久久久妻妇| 无码免费又爽又高潮喷水的视频 | 亚洲AV无码国产精品色午友在线| 无码精品国产dvd在线观看9久| 中文字幕一二三区| 亚洲不卡中文字幕无码| 欧美 亚洲 有码中文字幕| 久久激情亚洲精品无码?V| 88国产精品无码一区二区三区 | 国精品无码A区一区二区| 国产乱子伦精品无码码专区 | 无码乱码观看精品久久| 一区二区三区无码高清| 中文无码喷潮在线播放| 影院无码人妻精品一区二区 | 中文午夜乱理片无码| 人妻中文无码久热丝袜|