Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

      contact us

      聯系我們

      TEL:0531-84233822

      TEL:15550068833/13954115865

      E-mail:jinliyeya@126.com

      Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

      Company News

      Usage and installation steps of hydraulic lifting platform

      Source: Time:2020-03-14 09:02:33 views:

      Usage and installation steps of hydraulic lifting platform

      The usage method and installation steps of the 1137 hydraulic lifting platform. There are many details to pay attention to when using the hydraulic lifting platform. The following mainly discusses the installation steps of the hydraulic lifting platform:

      1、 Compilation basis: Based on the user manual of the guide rail elevator, construction organization design, and on-site geological conditions.

      2、 Preparation work before construction: (1) Inspect the work site for pits, ditches, hidden ditches, and holes, and check for high-voltage and communication lines above. If the above phenomena occur, take support measures. (2) Check for any obstacles on the entrance and exit roads. (3) The tools, toolboxes, rigging, rope buckles, safety helmets, safety belts, and other items used by various trades participating in the installation and dismantling of elevators (c ā n ji ā) shall be transported to the work site for backup.

      3、 Foundation: The aluminum (Al) alloy elevator foundation has been processed by the civil construction unit (ch ǔ l ǐ).

      4、 Basic requirements for safe operation: (1) Personnel involved in installation and dismantling must be familiar with the mechanical performance and structural characteristics of the elevator, and possess proficient operation and control techniques as well as the ability to troubleshoot general faults. (2) The workers involved in this work should have clear division of labor, each responsible for their own duties, with one person designated to direct the work and establish communication signals. (3) Adhere to all disciplines established to ensure safe production, carry complete safety equipment, and ensure that personnel working at heights meet the relevant regulations of the labor department. It is strictly prohibited to work under the influence of alcohol. (4) In the event of snow, rain, heavy fog, or weather with wind speeds exceeding 13 meters per second, this operation shall not be carried out. (5) The transformer power grid at the construction site shall have a transformer capacity of not less than 100KVA.

      5、 Inspection after installation: (1) Recheck whether each fastening point meets the requirements, and tighten if there is any looseness. (2) Check if all components are complete and in effective condition.

      6、 Installation completed:

      (1) The trial operation of the crane includes trial operation, static load test, and dynamic load operation. Before the previous step is qualified, the next step of trial operation cannot be carried out. ?

      (2) Clean the tools, rigging, equipment (sh è b è i), and debris on the construction site.

      (3) Personnel and equipment exit the site.

      {10}

      Links

      久久久久久国产精品无码下载 | 在线看片福利无码网址| 人妻丰满熟妇无码区免费| 亚洲日本va午夜中文字幕一区| 日韩人妻无码精品一专区| 欧美无乱码久久久免费午夜一区二区三区中文字幕 | 无码av免费毛片一区二区| 天堂亚洲国产中文在线| 久久亚洲AV成人无码国产| 中文字幕无码久久久| AV无码人妻中文字幕| 亚洲av午夜国产精品无码中文字| 未满十八18禁止免费无码网站| 中文精品人人永久免费| 日韩中文字幕视频| 一二三四社区在线中文视频| 69ZXX少妇内射无码| 日韩精品无码久久久久久| 亚洲国产精品无码一线岛国| 我的小后妈中文翻译| 中文www新版资源在线| 人妻中文字幕乱人伦在线| 亚洲av无码成人精品国产| 99无码人妻一区二区三区免费| 亚洲AV无码专区国产乱码电影| 无码人妻丰满熟妇区BBBBXXXX | 天堂资源8中文最新版| 久久亚洲中文字幕精品一区| 天堂无码在线观看| 亚洲av无码一区二区三区人妖| 国产精品午夜无码AV天美传媒 | 亚洲AV无码成人精品区狼人影院| 播放亚洲男人永久无码天堂| 92午夜少妇极品福利无码电影| 国产午夜无码精品免费看| 狠狠躁天天躁无码中文字幕图| 未满小14洗澡无码视频网站| 精品欧洲av无码一区二区三区| 国模无码一区二区三区| 无码精品人妻一区二区三区影院| 亚洲?V无码成人精品区日韩|